Engineering
Structural design & analysis
Full structural engineering services for pre-engineered buildings — from initial load analysis and 3D modelling to stamped construction drawings compliant with Philippine building codes.
PEB Philippines delivers precision-engineered steel buildings — from design and fabrication to full erection. On time. On budget. Built to last.
PEB Philippines is a Manila-based pre-engineered building company delivering complete steel building solutions — from structural engineering and in-house fabrication to professional erection.
We serve industrial, commercial, and agricultural clients nationwide, with a track record of on-time delivery and ASTM-grade materials on every project.
From blueprints to bolt-up, PEB Philippines handles every stage of your pre-engineered building project.
Structural design & analysis
Full structural engineering services for pre-engineered buildings — from initial load analysis and 3D modelling to stamped construction drawings compliant with Philippine building codes.
Precision-cut in our own facility
In-house fabrication of primary and secondary steel framing systems using ASTM A572 Grade 50 steel. Every component is hot-dip galvanized and primer-coated to 80 microns.
Fast, safe, on-schedule assembly
Professional on-site erection by our certified teams. We handle anchor bolt setting, column erection, roof framing, wall sheeting, and final inspections — fully turnkey.
One contract, zero hassle
Design, engineer, fabricate, and erect — all under one roof. Our turnkey package includes permits coordination, foundations advisory, and post-completion walkthrough.
We don't just sell steel. We deliver complete building solutions engineered for the Philippine climate, codes, and construction environment.
Pre-engineered buildings cost 20–40% less per square meter than conventional construction. Precision fabrication eliminates waste and reduces on-site labour hours.
Components are pre-cut and pre-drilled in our factory. Erection of a typical 1,000 sqm structure takes 4–6 weeks — not months. Your building earns money sooner.
All structural steel meets ASTM A572 Grade 50 standards. Secondary framing uses Z275 G450 galvanized purlins. Every weld is inspected. No shortcuts.
Our licensed civil and structural engineers, experienced fabricators, and certified erectors have completed projects across Luzon, Visayas, and Mindanao.
One point of contact from design to final inspection. We coordinate permits, foundations advisories, and utilities rough-in so nothing falls through the cracks.
Based in Manila, PEB Philippines serves clients nationwide with rapid response times, local knowledge of Philippine weather loads, and regulatory requirements.
6,000 sqm · 5-Storey Building
20,000 sqm
28,800 sqm · 672 tons
862 sqm · 150.9 tons
Four clear phases — from design to certified handover.
We develop the structural design, load calculations, cost plan, and stamped construction documents — reviewed and approved before we build.
We package the works, prequalify contractors and suppliers, and run a transparent bidding process through to contract award.
In-house fabrication and certified on-site erection — with schedule, cost, and QA/QC monitored at every step.
Final inspection, punch-listing, and certified completion — we hand over a finished, fully-documented structure.
"PEB Philippines delivered our 2,400 sqm warehouse on schedule and 15% under our original budget estimate. The steel quality is outstanding."
"We've worked with PEB Philippines on three factory buildings. Their turn-key approach saved us months of project management headache."
"From design to bolt-up in 8 weeks. The structural drawings were detailed, the fabrication was precise, and the erection team was professional."
"The cold storage facility maintains temperature consistently — insulation panels were installed with real precision. Our produce loss dropped significantly since we moved in."
"Responsive team throughout. We had permit delays on our end but PEB Philippines adjusted the schedule without any additional cost. Solid work all around."
"We needed a 3,800 sqm production facility fast. PEB Philippines mobilized within a week of signing and hit every milestone. Our factory opened two months ahead of schedule."
"Their structural engineers submitted drawings that our local building office approved on the first pass. That alone saved us weeks of back-and-forth."
"This is our third project with PEB Philippines. Every time they bring the same level of detail and the same responsive team. Pricing is transparent — no surprise add-ons."
"PEB Philippines delivered our 2,400 sqm warehouse on schedule and 15% under our original budget estimate. The steel quality is outstanding."
"We've worked with PEB Philippines on three factory buildings. Their turn-key approach saved us months of project management headache."
"From design to bolt-up in 8 weeks. The structural drawings were detailed, the fabrication was precise, and the erection team was professional."
"The cold storage facility maintains temperature consistently — insulation panels were installed with real precision. Our produce loss dropped significantly since we moved in."
"Responsive team throughout. We had permit delays on our end but PEB Philippines adjusted the schedule without any additional cost. Solid work all around."
"We needed a 3,800 sqm production facility fast. PEB Philippines mobilized within a week of signing and hit every milestone. Our factory opened two months ahead of schedule."
"Their structural engineers submitted drawings that our local building office approved on the first pass. That alone saved us weeks of back-and-forth."
"This is our third project with PEB Philippines. Every time they bring the same level of detail and the same responsive team. Pricing is transparent — no surprise add-ons."
Book a meeting with our engineers or request a quote. We'll help you choose the right system and give you a clear cost and timeline — no guesswork.
UNIT 204-205 2/F L&LV BENITEZ BLDG.
53 Nicanor Ramirez St., Brgy Don Manuel
Quezon City, Metro Manila, Philippines
Office Hours
Tell us about your build. We'll send back an estimate and a timeline.
We'll be in touch within 24 hours with your estimate.
Please try again or call us directly.